The Beveridge Intermodal Precinct will play a central role in strengthening Australia’s national freight network and supporting the future growth of Melbourne’s northern corridor.

About Beveridge Intermodal Precinct

Located in Melbourne, at the centre of Australia’s freight network, Beveridge Intermodal Precinct will support a more efficient, resilient and connected supply chain, helping to lower the cost of moving goods for businesses and consumers.

Spanning 900 hectares, with around 400 hectares available for development, the precinct will integrate an open‑access intermodal terminal with co‑located warehousing and logistics services. Its strategic location enables more efficient rail connections to key national markets, supporting longer, higher-capacity freight services and improving the movement of goods across the network.

Beveridge near 260121a (1).jpeg

Timeline

  1. We are here

    2026 – 2028

    Construction

  2. 2028

    Rail Terminal Operational

  3. 2029+

    Warehouse & land development

Sustainability is central to the design and delivery of the Beveridge Intermodal Precinct. From early planning through to long‑term operations, the project is focused on creating a cleaner, more efficient and resilient freight precinct that supports Australia’s transition to a low‑emissions future.

The precinct has been designed to encourage a significant modal shift from road to rail, reducing emissions, congestion and fuel use across Victoria’s freight network. Environmental considerations are embedded across the project — from protecting local ecosystems to implementing responsible water and energy management practices.

National Intermodal is also prioritising sustainable construction outcomes, including reduced‑impact materials, responsible waste management and opportunities for habitat enhancement. As the precinct progresses, we will continue working with government, industry and community partners to ensure Beveridge delivers long‑term environmental, social and economic value.

The Beveridge Intermodal Precinct will be part of the region for generations to come and being connected with our local community is a priority.

58

stakeholder meetings

151,400+

total webpage hits

500+

community interactions across five shopping‑centre pop‑ups

65

community members participated in local drop‑in sessions and Town Halls

 3,350

project letters delivered to local dwellings in the Beveridge and Wallan postcodes

53,576

Facebook users reached by project advertisements

23

completed community surveys

128

emails received via the project inbox

200+

200+

direct engagement activities and channels

Community Feedback

Community feedback has played an important role in shaping the development of the Beveridge Intermodal Precinct. The feedback gathered to date has helped us understand what matters most to the community and what needs to be considered to minimise impacts and address concerns.

Community input has directly informed:

  • Engagement approach and communication channels
  • Technical studies undertaken as part of the Project
  • Measures to manage and minimise potential impacts
  • Proposed construction management and planning

Join the Community Mailing List

Stay informed about the latest news, engagement opportunities and project milestones. Sign up to our e‑newsletter and get updates delivered directly to your inbox.

papper plane

Past Community Engagement Activities

Tile 1
Tile 2
Tile 3
Tile 4
Tile 5
Tile 6
Tile 7
Tile 8

Get in touch

Your feedback matters. If you have a question, would like to make a complaint or want to speak with the team, we’re ready to hear from you.

Join us to find out more about the Beveridge Intermodal Precinct

If you weren't able to join us at our pop-up community information events in October 2026, you'll find us at the Whittlesea Show in November.

Drop by at a time that suits you and enjoy a complimentary tea or coffee. It's an opportunity to meet the project team, ask questions, and learn more about the Precinct.

Event details

Whittlesea Show - 9am to 5pm Saturday 7 November and Sunday 8 November 2026.

IMG_2211-scaled.webp

How feedback is shaping the Project

Community feedback has played an important role in shaping the development of the Beveridge Intermodal Precinct. The feedback gathered to date has helped us understand what’s important to the community and what needs to be considered to minimise impacts and address concerns.

Feedback has influenced:

  • Engagement approach and communication channels

  • Technical studies associated with the Project

  • Measures to manage and minimise potential impacts

  • Proposed construction management and planning.

There are many opportunities to stay informed and have your say, including newsletters, social media, shopping centre pop-ups, and community drop-in sessions.

You can also sign up for email updates and connect with us on LinkedIn.

Works at Beveridge Intermodal Precinct

Works are continuing at the Beveridge Intermodal Precinct as we progress Stage 1 construction, transforming the Beveridge Road site into a nationally significant logistics hub.

Stage 1 includes a permanent rail connection to the national freight network, an operating rail terminal, and locally focused road upgrades, including works to Minton Street and surrounding areas. Future stages, subject to planning approvals, will deliver a fully automated terminal and extensive co‑located warehousing.

South Phase 1_260819.jpg

What’s happening on site

Over the coming months, you may notice an increase in construction activity across the site. Key works planned from October – December 2026 include:


Continuing major earthworks to level and prepare the site
  • Ongoing works and material deliveries for a new rail bridge at the northern end of the site, including concrete works
  • Ongoing Indigenous cultural heritage salvage activities at designated locations
  • Utility service upgrades and drainage works within the project area

A planned rail shutdown is scheduled for 7 – 9 November 2026, allowing works to be carried out safely near the rail corridor. These works will support future construction of the new rail bridge.


Construction hours

Normal construction hours are:

  • Monday to Friday: 7am to 6pm
  • Saturday: 7am to 1pm

Some works may be required outside these hours, including occasional 24‑hour works during peak construction activities. We will notify the community in advance if out‑of‑hours works are required.


Traffic and road impacts

There will be an increase in construction vehicles, including trucks and heavy vehicles, on Beveridge Road and surrounding roads.

To manage impacts, we will put measures in place such as:

Traffic controllers, signage and detours Periods of shuttle‑flow traffic (one lane at a time) on Beveridge Road From October – December 2026, ongoing material deliveries may require short traffic holds. We will notify the community of any major road impacts.


Managing construction impacts

We are taking steps to minimise impacts on the local community, including:

Noise and vibration: Low levels of noise and vibration are expected for most works. Higher noise levels may occur for short periods during foundation works or rock breaking, with monitoring in place.

Dust management: Dust will be managed using best‑practice measures such as watering materials and covering soil stockpiles.

Positive Impact

A place to build a long-term career

Beveridge Intermodal Precinct will be built over time and operate for decades. That means ongoing work, not just during construction but well into the future.

In the early stages, most roles will support building the terminal and surrounding precinct.

As the precinct becomes operational, jobs will shift into day-to-day freight and logistics, including:

  • Terminal operations
  • Warehousing and distribution
  • Freight coordination
  • Maintenance and site services

As the site grows, so will the range of roles and opportunities available.

Current opportunities

Logo

John Holland is the Design and Construction contractor helping deliver the precinct.

Current construction roles are available via their careers platform.

Careers at John Holland
Logo

For ongoing opportunities with National Intermodal, visit our careers page.

Careers at National Intermodal

Built with local capability

We’re prioritising participation from Melbourne’s north. Beveridge Intermodal Precinct is more than a precinct—it’s a long-term investment in regional capability.

A locally embedded workforce strengthens:

  • Operational continuity
  • Skills development across the logistics sector
  • Economic resilience in surrounding communities

Evolving opportunities in a growing precinct

Employment at Beveridge will grow and change as the precinct develops:

Construction phase
  • Civil works and infrastructure delivery
  • Engineering and project management
  • Site operations

Operations phase
  • Terminal operations
  • Freight coordination and logistics
  • Warehousing and distribution
  • Maintenance and asset management
  • Security and site services

This transition reflects the shift from project delivery to a legacy piece of national infrastructure.

Project timeline

  1. 2023

    Concept and business case

  2. 2023 – 2025

    Design and planning

  3. We are here

    2026 – 2028

    Construction

  4. 2029+

    Operations

National significance, local impact

As Australia’s largest intermodal precinct, Beveridge will reshape how freight moves across the country.

This scale enables:

  • More efficient national supply chains
  • Reduced congestion in urban freight networks
  • Growth in logistics and associated industries

In addition to these national benefits, the precinct will help create sustained local employment and business activity.

Environment Protection and Biodiversity Conservation Act 1999

On 25 July 2025, the Minister for Environment determined that the Beveridge Intermodal Precinct (the project) could proceed as an Action in accordance with sections 18, 18A and 28A of the Environment Protection and Biodiversity Conservation Act 1999 (Cth) (EPBC Act), subject to conditions under EPBC Approval 2023/09693.

In accordance with the Annual Compliance Reporting requirements under Conditions 23 to 27 of EPBC Approval 2023/09693, a compliance report must be published on the National Intermodal website within 20 business days of each 12-month period following the approval date (25 July 2025). The report must address compliance with each condition of the approval.

National Intermodal has prepared Beveridge Intermodal Precinct, Beveridge, Victoria (EPBC 2023/09693): Year 1 Annual Compliance Report for the reporting period from 25 July 2025 to 25 July 2026. The report outlines the status of the Project’s compliance with the conditions of EPBC Approval 2023/09693 during the reporting period.